The full refurbishment of an industrial building in Alfragide, to accommodate BIOSONDA’s new headquarters, required a response capable of combining functional reorganisation, technical adaptation and an overall improvement in building performance. COLUNA supported the process through Integrated Design and Design Management services, contributing to the transformation of the asset into a hybrid workplace combining office functions and support logistics, organised across two upper floors for administrative use and a semi-basement level dedicated to storage, back-of-house functions and logistics reception control, with the integration of more sustainable and efficient technical systems.
Key Challenges
and Solutions Adopted
Services provided
Results /
Impact for the Client
- Full conversion of an industrial building into a new corporate headquarters
- Clear articulation between office areas, support spaces and light logistics functions
- Improved technical, energy and environmental performance
- Integration of more sustainable solutions and more efficient infrastructure
- Stronger functional, regulatory and operational conditions for the asset
Related Projects
Zurin Charm Hotel
The full conversion and vertical extension of an institutional building into a 3-star hotel, comprising…
Learn more →
Hotel Belavista da Luz
The overall repositioning of Hotel Bela Vista da Luz, in Lagos, sought to transform an…
Learn more →
Inflammatix Building
The refurbishment of two existing industrial buildings in Lisbon, for the installation of Inflammatix’s research…
Learn more →
Hotel Caravela
The extension and full refurbishment of an existing hotel building in central Lisbon required a…
Learn more →
Biosonda Office
The full refurbishment of an industrial building in Alfragide, to accommodate BIOSONDA’s new headquarters, required…
Learn more →
Cascais City & Beach Hotel
The full refurbishment of a former guesthouse in Cascais, converted into a 3-star hotel with…
Learn more →