The refurbishment of two existing industrial buildings in Lisbon, for the installation of Inflammatix’s research and development unit, required an approach capable of combining technical rigour, multidisciplinary coordination and operational reliability. COLUNA supported the process through Technical Due Diligence, Design Management and Integrated Design, contributing to the transformation of the complex into a hybrid environment of laboratories, technical storage and offices, with an integrated response to the regulatory, infrastructural and functional requirements of a medical technology operation.
Key Challenges
and Solutions Adopted
Services provided
Results /
Impact for the Client
- Successful refurbishment of two industrial buildings into an R&D and office facility
- Strong technical coordination between architecture, engineering and operational requirements
- Reduced risk of delay and rework through prior compatibility review and construction sequence control
- Better preparation of the asset for a phased and reliable start-up
- Reinforced technical robustness, compliance and continuity of operation across the facility
Related Projects
Zurin Charm Hotel
The full conversion and vertical extension of an institutional building into a 3-star hotel, comprising…
Learn more →
Hotel Belavista da Luz
The overall repositioning of Hotel Bela Vista da Luz, in Lagos, sought to transform an…
Learn more →
Inflammatix Building
The refurbishment of two existing industrial buildings in Lisbon, for the installation of Inflammatix’s research…
Learn more →
Hotel Caravela
The extension and full refurbishment of an existing hotel building in central Lisbon required a…
Learn more →
Biosonda Office
The full refurbishment of an industrial building in Alfragide, to accommodate BIOSONDA’s new headquarters, required…
Learn more →
Cascais City & Beach Hotel
The full refurbishment of a former guesthouse in Cascais, converted into a 3-star hotel with…
Learn more →