The construction of a new support pavilion for fishing operations at the Port of Sesimbra required a response capable of combining operational efficiency, construction durability and strict hygiene standards within a highly demanding port environment. Developed in partnership with IMARTE, the project was supported by COLUNA through Integrated Design and Design Management services, contributing to the definition and optimisation of a programme comprising a seine fish market, ice storage, fish sorting and handling areas, dispatch docks, support spaces and an elevated technical walkway for observing the operational process.
Key Challenges
and Solutions Adopted
Services provided
Results /
Impact for the Client
- Clear structuring of a complex industrial programme linked to the fishing sector
- Better coordination between auction, handling, dispatch and support areas
- Improved durability and hygiene performance of the construction solutions
- Greater technical and financial control throughout the project’s development
- Robust preparation of a port facility oriented towards operational efficiency and sanitary performance
Related Projects
Zurin Charm Hotel
The full conversion and vertical extension of an institutional building into a 3-star hotel, comprising…
Learn more →
Hotel Belavista da Luz
The overall repositioning of Hotel Bela Vista da Luz, in Lagos, sought to transform an…
Learn more →
Inflammatix Building
The refurbishment of two existing industrial buildings in Lisbon, for the installation of Inflammatix’s research…
Learn more →
Hotel Caravela
The extension and full refurbishment of an existing hotel building in central Lisbon required a…
Learn more →
Biosonda Office
The full refurbishment of an industrial building in Alfragide, to accommodate BIOSONDA’s new headquarters, required…
Learn more →
Cascais City & Beach Hotel
The full refurbishment of a former guesthouse in Cascais, converted into a 3-star hotel with…
Learn more →