The full conversion and vertical extension of an institutional building into a 3-star hotel, comprising 36 rooms across 7 floors, required an integrated approach from the initial technical assessment through to construction. COLUNA supported the process through Technical Due Diligence, Design Management and Integrated Design, ensuring the building was successfully adapted to its new hospitality use from a functional, technical and regulatory perspective.
Key Challenges
and Solutions Adopted
Services provided
Results /
Impact for the Client
- Early mitigation of technical and planning-related risks before construction commenced
- Successful conversion of an institutional asset into a competitive urban hotel
- Increased asset value and improved hospitality performance
- Stronger confidence from both the client and funding stakeholders
Related Projects
Zurin Charm Hotel
The full conversion and vertical extension of an institutional building into a 3-star hotel, comprising…
Learn more →
Hotel Belavista da Luz
The overall repositioning of Hotel Bela Vista da Luz, in Lagos, sought to transform an…
Learn more →
Inflammatix Building
The refurbishment of two existing industrial buildings in Lisbon, for the installation of Inflammatix’s research…
Learn more →
Hotel Caravela
The extension and full refurbishment of an existing hotel building in central Lisbon required a…
Learn more →
Biosonda Office
The full refurbishment of an industrial building in Alfragide, to accommodate BIOSONDA’s new headquarters, required…
Learn more →
Cascais City & Beach Hotel
The full refurbishment of a former guesthouse in Cascais, converted into a 3-star hotel with…
Learn more →